ERAS conducted a technical review of historical documents to attempt to determine the source of chlorinated solvents (VOCs) found in 1988 in a former groundwater monitoring well on the Property. Files were reviewed to evaluate thedistribution and extent of VOCs nearby and sites.

ERAS conducted a Phase 2 soil and groundwater investigation under the oversight of the California RWQCB.  The investigation indicated the presence of a regional groundwater contamination plume as well as some contribution of solvent contamination from a former tenant of the Property.

ERAS performed a sub-slab soil vapor subsurface investigation that indicated a possible threat to indoor air conditions. Based on these results, ERAS subcontracted an indoor air sampling specialist to evaluate risk of exposure to solvent from under the building.  It was determined to be no risk to indoor air and the case was closed by the RWQCB.

Client: Mr. Jim Nicholson, Dinsmore Landscaping. occupant and prospective buyer of Property

ERAS ESA indicated the site once contained a fuel tank and two waste oil tanks but their locations were unknown. Previous Phase 2 sampling data indicated elevated concentrations of PCBs and metals in two locations.

 ERAS conducted specialized and detailed historical aerial photographic evaluation to determine the location  of the former fuel and waste oil tanks and the storage sheds where chemicals may have been stored. A Phase 2 soil sampling investigation that included fourteen(14) soil borings was conducted to take depth appropriate samples. An additional investigation was conducted to further delineate the extent of phenol in soil.

Client: Mr. Steve Shepard, Shephard & Sons, occupant and prospective buyer of Property

Property is in a heavy industrial area that was once part of the Kaiser World War 2 shipyard.  ERAS performed additional historical research which indicated the Property is located on what was formerly San Francisco Bay marshland.  ERAS also reviewed technical reports of Phase 2 soil testing and groundwater monitoring of 4 existing groundwater monitoring wells.

ERAS developed a complete cost estimate for site investigation and remediation of four separate areas on the Property contaminated with PCBs, petroleum hydrocarbons and metals leading to case closure.  ERAS performed three separate Phase 2 subsurface soil andgroundwater investigations that included a total of thirty-eight (38) soil borings with oversight from the California Regional Water Quality Control Board (RWQCB).

ERAS established it was likely the contamination was associated with the landfilling of the former marshland because the contamination was restricted to the groundwater interface at approximately 8 feet below ground surface.  ERAS also established the contamination was restricted to the Property and there were no threats to off-site receptors or occupants of the building.

The RWQCB closed the case with a deed restriction that allowed current commercial use.  The total cost of the case closure was approximately 30% of the original closure estimate.

Client: Mr. Yates McKenzie, Stella Capital. owner of Property

A Phase 2 investigation was conducted by another consultant on the subject site based on the former operation of machine shop and a foundry with a furnace located in the outside yard area.  ERAS prepared a workplan for the Alameda County Department of Environmental Health (ACDEH) and performed additional investigation consisting of additional soil borings. 

It was determined contaminants of concern were petroleum hydrocarbons, naphthalene and lead.  Soil vapor sampling indicated concentrations of naphthalene and also methane (from the degradation of petroleum) in subsurface vapor.  Fortunately, naphthalene was not located in soil vapor under the building.  Soil remediation was performed to remove soil with hazardous concentrations of lead and naphthalene, the soil was properly disposed as hazardous waste.  A vapor mitigation system (VMS) was installed to mitigate the hazard of methane buildup.

ERAS prepared a Site Management Plan for operation and maintenance of the VMS and the case was closed by the ACDEH.

Client: John Murray of Murray Productions